October aerial view of Building 1 under construction at Clear Springs Logistics Park

Annville, Pennsylvania · 2026

Progress,
documented.

Two major facilities. One growing logistics campus. A close field record of the work at Clear Springs.

See the October update
Active project
Building 1 · 800 Killinger Road
Separate facility
DHL Building 2 · 700 Killinger Road
Field record
May through October 2026

One campus.
Two distinct stories.

The documentation follows construction of Building 1 at 800 Killinger Road and a separate look inside DHL Supply Chain's completed Building 2 at 700 Killinger Road.

Each project remains clearly identified while the larger campus story stays connected.

Building 1 under construction on October 5, 202601 · Active constructionBuilding 1800 Killinger Road · Project KeystoneDHL Building 2 exterior at 700 Killinger Road02 · Separate completed facilityDHL Building 2700 Killinger Road

From pad
to presence.

The 2026 field record begins with an active building pad and follows the 1.2 million square foot facility through structure, enclosure, and ongoing exterior and interior work.

Address
800 Killinger Road
Annville, PA 17003
Scale
Approximately 1.2M SF
40-foot clear height
Capacity
120 dock doors
295 trailer stalls
  1. May 5Site + foundations
  2. June 8Early vertical work
  3. July 8Structure + enclosure
  4. August 3Building shell
  5. September 4Exterior + interior work
  6. October 5Paving + interior progress

May 5, 2026

The footprint is set.

The first visit establishes the entire site: the working pad, circulation, early foundation activity, and Building 2 already standing nearby.

Aerial view across the Building 1 construction pad
Building 1 pad · May 2026
Building 1 construction pad beside the completed logistics building
Campus context
Site entrance and active work area at Building 1
Road + site access
Wide aerial context of Clear Springs Logistics Park
The wider logistics campus

The build, in motion.

Each film holds its own date and viewpoint, keeping the sequence compact while making the month-to-month change easy to read.

May 5, 2026The starting point
June 8, 2026The footprint advances
July 8, 2026Vertical progress
August 3, 2026The shell takes shape
0:00 / 1:21
September 4, 2026 · 01:21 · 1080pExterior and interior work
0:00 / 0:59
October 5, 2026 · 00:59 · 1080pPaving and interior progress
Building 1 viewed from above on October 5, 2026

Work continues, outside and in.

The October visit follows site paving, interior framing, and drywall work, with aerial views of the building and surrounding campus.

See the change

May to October,
side by side.

The first aerial baseline and latest campus view make the transformation visible without crowding the story.

Building 1 site in May 2026
ThenMay 5, 2026
Building 1 exterior and site work in October 2026
LatestOctober 5, 2026

DHL at
700 Killinger.

This is not Building 1. The July and August photography documents the completed one million square foot DHL Supply Chain facility next door, from its long exterior elevations to the finished offices, employee spaces, warehouse floor, and rack systems.

Address
700 Killinger Road
Annville, PA 17003
Scale
1,004,640 SF
40-foot clear height
Facility
100 dock doors
230 trailer stalls
Wide aerial view of DHL Building 2
DHL Building 2 · 700 Killinger Road
DHL warehouse rack system
Storage systems
Wide view across the completed DHL warehouse floor
Warehouse floor
Long aisle through DHL warehouse racking
Rack aisle
Finished private office inside the DHL facility
Office
Finished training and break space inside the DHL facility
Team space
Employee locker room inside the DHL facility
Employee facilities
Open floor and dock positions inside DHL Building 2
Completed interior · August 2026

Inside Building 2.

The completed tour connects the warehouse scale, racking, offices, and support spaces in one continuous view.

Two buildings.
Clearly credited.

Roles are labeled by building. Peak, Harris Architects, and Warehaus are named on both projects; SMBH is named for Building 1, and DHL Supply Chain is named for Building 2.